Install LiBCM Equipped Battery
Follow these instructions to install a pre-assembled LiBCM IMA battery into your car
0: Watch the safety video
1: Remove existing NiMH battery
2: Modify IMA bay
3: Install edge trim grommet
4: Install metal bracket
LiBCM Packs purchased from GreenTec do not include the metal bracket or MCM computer. You will need to reuse these parts from your existing pack.
5: Install LiBCM IMA battery
Addendum: LiBCM units shipped after 2022MAY contain a large ferrite core, which reduces conducted noise inside the IMA bay. Before connecting the high current HVDC cables to the junction board (at 2:00 into the video above), route BOTH high current HVDC cables through this (non-conductive) ferrite core. I will eventually add this step to the videos... for now, the cables should look like this once routed through the ferrite hole: